Project Name: Murra Warra Windfarm – STAGE 1
Client Name: Symal (formerly Civilex)
Project Description: Murra Warra Windfarm located 25kms from Horsham.
The Murra Warra Wind Farm is being constructed in two stages – with Stage 1 comprising 61 turbines in the south west of site, and Stage 2
comprising 55 turbines towards the north east of site.
Once complete, the wind farm will be able to produce 429MW of electricity – enough clean energy to power approximately 420,000 homes and
save roughly 1.7 million tonnes of carbon emissions each year.
Foundation reinforcing required accurate radius bending (36mm dia. Bar), pre-slinging of bundles, creative logistical solution to optimise
efficiency, reduce costs and ensure continuity of supply on an aggressive construction program.
Tonnage: 1800T